• Home
  • General
  • Two Tumbleweeds - Project Planner Notepad - 7
Ami Venture US

Two Tumbleweeds - Project Planner Notepad - 7 X 10

$13.18     $15.82   17% Off     (Free Shipping)
1 available
  • Brand: Two Tumbleweeds
  • Category: General
  • Code: OFFACB0B582Z36C
  • Weight: 1 pounds
  • Shipping Weight: 2.5 
  • Dimensions:  0.01  x 0.01  x 0.01  inches
  • Item ID: 4450035
  • List Price: $15.82
  • Seller: Ami Venture US
  • Availability: 1
  • Ships from: United States
  • Ships in: 9 business days
  • Transit time: Up to 4 business days
  • Delivery by: Mar 26 to Mar 28
  • 50 High-Quality Sheets Minimalist Design Thats Attractive And Versatile 7X10 Inch Sheets Are Printed On 70 Lb Premium Paper 100% Unique Designs Printed In The Usa, With Paper Use Offset By Planting Trees Through Print Releaf A Simple Solution To Help You Easily Plan And Manage All Your Individual And Team Projects

Our Minimalist Notepads Are Designed To Be A Simple Solution To Help You Easily Plan Your Life, Stress Less, And Be Happier And More Productive The Project Action Notepad Features Goals And Objectives So You Stay Focused On The Project At Hand, Plus Space For Notes And Questions And A Action Item Checklist So With Space To Assign Responsibility And Deadlines So That The Whole Team Stays On Task The Versatile Design Can Be Used For Projects At Home, Work, School, Or Business To Organize, Manage A Team, And To Delegate Tasks This Notepad Is A Simple Way To Make Sure You Finish What You Start And Accomplish More

Actual product packaging and materials may contain more and/or different information than that shown on our website. We recommend that you do not solely rely on the information presented and that you always read labels, warnings, and directions before using or consuming a product.


For additional information about a product, please contact the manufacturer. Content on this site is for reference purposes and is not intended to substitute for advice given by a physician, pharmacist, or other licensed health-care professional. ZiFiti does not assume liability for inaccuracies or misstatements about products.


Statements regarding dietary supplements have not been evaluated by the FDA and are not intended to diagnose, treat, cure, or prevent any disease or health condition.

Add Review

Recommendations